Nakhon Sawan Epoxy FRP Crossing Project, ThailandThe Nakhon Sawan Rock Crossing Project in Thailand is the first overseas anti-corrosion project in the international market to adopt full-length epoxy FRP outer protection for crossing pipelines. It also marks a crucial milestone in our company’s major strategic shift from focusing on the domestic market to expanding into global overseas markets. -
Yangtze River Crossing Project, Crossing Branch of China Petroleum Pipeline BureauRelying on high-quality products, reliable, easy-to-operate construction processes with guaranteed quality and quantity, as well as a professional technical team, our company won the exclusive bid for the FRP protective layer used in the 2012 Yangtze River directional drilling crossing project tender issued by the Crossing Branch of China Petroleum Pipeline Bureau. We became the construction and supply enterprise responsible for China’s first epoxy FRP protection application on a Yangtze River pipeline crossing, known domestically as the "First Yangtze River Crossing with Epoxy FRP". -
Crossing Works of Yongtaiwen Project, East China Branch, Sinopec Sales Co., Ltd.The rock crossing project of Zhejiang Yongtaiwen Product Oil Pipeline is Sinopec’s first mountain crossing project that adopts full-length epoxy FRP outer protection for crossing pipelines. The outer diameter of the crossing pipeline in this project is Φ406 mm, and the total length of the crossing section is 405 meters. -
Section 2 of Route Works for Yangjiang-Jiangmen Trunk Line Project of Western Guangdong Natural Gas Main Pipeline NetworkFRP Anti-corrosion Works for Directional Drilling Crossing Pipelines, Route Engineering, Section Yangjiang-Jiangmen Trunk Line Project of Western Guangdong Natural Gas Main Pipeline Network
The construction of φ813 mm FRP covering an area of 2,733 square meters has been completed with excellent contract performance. -
Jieyang Natural Gas Pipeline Project, No.1 Branch of China Petroleum Pipeline Engineering Co., Ltd.FRP Anti-Corrosion Project for Directional Drilling Crossing Pipelines of Jieyang Natural Gas Pipeline Project
The construction of φ813 mm FRP covering an area of 3,888 square meters has been completed with satisfactory contract performance. -
Heat Shrink Tape Engineering of Changchun-Shijiazhuang Natural Gas Pipeline (Zhangjiakou-Shijiazhuang Section)From 2025 to 2026, Changyuan Changtong New Materials Co., Ltd. supplied a total of 23,733 sets (approximately 237 kilometers) of FRDP 1422*520/2.7 mm radiation-crosslinked polyethylene heat shrinkable tapes (matched with 200-micron dry-film primer) for the Zhangjiakou-Shijiazhuang Section of the Changchun-Shijiazhuang Natural Gas Pipeline.